Project: Construction of the Detention Basin "D" Phase 1 to Serve Galveston County Municipal Utility District No. 46 
Project Number: 0074-0527D 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Galveston County M.U.D. No. 46 
Engineer: Ben Lun, P.E. 
Pre Bid Date: 10:30 AM Tuesday, March 25, 2008 
Bid Open Date: 10:30 AM Tuesday, April 1, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1        2      

Project: Construction of Water Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge 95 
Project Number: 0472-2695 
Apparent Bid
Result

Owner: Montgomery County M.U.D. No. 386 
Engineer: Donnie Reed, P.E. 
Pre Bid Date: 10:00 AM Thursday, March 27, 2008 
Bid Open Date: 2:00 PM Thursday, April 3, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Windsor Creek at the Village of Creekside Park S. Greenprint Circle Extension 
Project Number: 0472-8106 
Apparent Bid
Result

Owner: Harris-Montgomery County M.U.D. No. 386 
Engineer: Donnie Reed, P.E. 
Pre Bid Date: 10:30 AM Thursday, March 27, 2008 
Bid Open Date: 2:30 PM Thursday, April 3, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of Sanitary Force Main to Serve The Woodlands 400 Acre Tract 
Project Number: 0472-7003A 
Apparent Bid
Result

Owner: Harris-Montgomery County M.U.D. No. 386 
Engineer: Donnie Reed, P.E. 
Pre Bid Date: 11:00 AM Thursday, March 27, 2008 
Bid Open Date: 3:00 PM Thursday, April 3, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1        2        3      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Edgewater Section Three 
Project Number: 1118-0660A 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Harris County M.U.D. No. 481 
Engineer: Edmund D. Rucker, P.E. 
Pre Bid Date: 3:00 PM Tuesday, March 25, 2008 
Bid Open Date: 3:00 PM Tuesday, April 8, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1        2        3      

Project: Construction of the Storm Water Pump Station No. 2 Pumps, Controls and Electrical Modifications to Serve Fort Bend County Levee Improvement District No. 17 
Project Number: 1800-0313B-012 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Fort Bend County Levee Improvement District No. 17 
Engineer: Jason M. Kelly, P.E. 
Pre Bid Date: 11:00 AM Wednesday, April 2, 2008 
Bid Open Date: 11:00 AM Wednesday, April 9, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of the Paving and Appurtenances to Serve Meadowcroft Boulevard and Wescott Avenue Phase III 
Project Number: 1800-1009A 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Fort Bend County M.U.D. No. 138 
Engineer: Jason M. Kelly, P.E. 
Pre Bid Date: 2:00 PM Thursday, April 3, 2008 
Bid Open Date: 2:00 PM Thursday, April 10, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Broadway Improvements from Kingsley Drive to Kirby Drive 
Project Number: 1546-5180 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Reinvestment Zone No. 2, City of Pearland, Texas 
Engineer: James D. Ross, P.E. 
Pre Bid Date: 2:00 PM Tuesday, April 8, 2008 
Bid Open Date: 2:00 PM Tuesday, April 15, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $100.00 
Addendums:   1      

Project: Construction of the Force Main and Access Road to Serve Woodforest Phase 1 
Project Number: 1173-0801 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Montgomery County M.U.D. No. 113 
Engineer: Donnie Reed, P.E. 
Pre Bid Date: 1:30 PM Wednesday, April 2, 2008 
Bid Open Date: 1:30 PM Thursday, April 17, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $80.00 
Addendums:   1        2      

Project: Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 97 
Project Number: 0472-2697 
Apparent Bid
Result

Owner: Harris-Montgomery County M.U.D. No. 386 
Engineer: Randy Bowles, P.E. 
Pre Bid Date: 10:00 AM Thursday, April 10, 2008 
Bid Open Date: 2:00 PM Thursday, April 17, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1        2      

Project: Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 96 
Project Number: 0472-2696 
Apparent Bid
Result

Owner: Harris-Montgomery County M.U.D. No. 386 
Engineer: Randy Bowles, P.E. 
Pre Bid Date: 10:30 AM Thursday, April 10, 2008 
Bid Open Date: 2:30 PM Thursday, April 17, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 21 
Project Number: 1470-1121 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Sienna Plantation M.U.D. No. 10 
Engineer: James E. Brown, P.E. 
Pre Bid Date: 1:00 PM Thursday, April 24, 2008 
Bid Open Date: 1:00 PM Thursday, May 1, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 

Project: Construction of Water Distribution and Drainage Facilities to Serve The Woodlands Phase 3 Village of Grogan's Mill Lake Woodlands East Shore Mid Lake Reserve A 
Project Number: 0472-0840A 
Apparent Bid
Result

Owner: Montgomery County M.U.D. No.'s 6, 60 and 67 
Engineer: Donnie Reed, P.E. 
Pre Bid Date: 10:00 AM Thursday, April 24, 2008 
Bid Open Date: 2:00 PM Thursday, May 1, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of Pavement and Drainage Facilities to Serve The Woodlands Gosling Road and Flintridge Road Dualization 
Project Number: 0472-0271 
Apparent Bid
Result

Owner: The Woodlands Road Utility District No. 1 
Engineer: Donnie Reed, P.E. 
Pre Bid Date: 10:30 AM Thursday, April 24, 2008 
Bid Open Date: 2:30 PM Thursday, May 1, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 94 
Project Number: 0472-2694 
Apparent Bid
Result

Owner: Montgomery County M.U.D. No. 386 
Engineer: Donnie Reed, P.E. 
Pre Bid Date: 11:00 AM Thursday, April 24, 2008 
Bid Open Date: 3:00 PM Thursday, May 1, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of the Proposed Signalization at Oyster Creek Place Drive/Sienna Ranch Road at Hwy 6 
Project Number: 1475-0703 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Sienna Plantation Management District 
Engineer: Matthew Johnson, P.E. 
Pre Bid Date: 11:00 AM Thursday, May 8, 2008 
Bid Open Date: 11:00 AM Thursday, May 15, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Ditches "6L" and "6M" 
Project Number: 0472-7010 
Apparent Bid
Result

Owner: Harris-Montgomery Counties M.U.D. No. 386 
Engineer: Randy Bowles, P.E. 
Pre Bid Date: 10:00 AM Wednesday, May 7, 2008 
Bid Open Date: 2:00 PM Thursday, May 15, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 22 
Project Number: 1470-1122 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Sienna Plantation M.U.D. No. 10 
Engineer: James E. Brown, P.E. 
Pre Bid Date: 1:00 PM Tuesday, May 13, 2008 
Bid Open Date: 1:00 PM Tuesday, May 20, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 98 
Project Number: 0472-2698 
Apparent Bid
Result

Owner: Harris-Montgomery Counties M.U.D. No. 386 
Engineer: Randy Bowles, P.E. 
Pre Bid Date: 10:00 AM Thursday, May 15, 2008 
Bid Open Date: 2:00 PM Thursday, May 22, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 15 
Project Number: 1470-1115 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Sienna Plantation M.U.D. No. 10 
Engineer: James E. Brown, P.E. 
Pre Bid Date: 10:00 AM Wednesday, May 21, 2008 
Bid Open Date: 10:00 AM Wednesday, May 28, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of the Drainage Channel/Amenity Lakes (Regional Storage Phase 2) to Serve Sienna Village of Anderson Springs Section 15 
Project Number: 1470-1115A 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Sienna Plantation M.U.D. No. 10 
Engineer: James E. Brown, P.E. 
Pre Bid Date: 10:30 AM Wednesday, May 21, 2008 
Bid Open Date: 10:30 AM Wednesday, May 28, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of the Woodridge Main Lift Station to Serve Woodridge M.U.D. 
Project Number: 1991-0002 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Woodridge M.U.D. 
Engineer: Matthew Richter, P.E. 
Pre Bid Date: 2:00 PM Wednesday, May 21, 2008 
Bid Open Date: 2:00 PM Wednesday, May 28, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 23 
Project Number: 1470-1123 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Sienna Plantation M.U.D. No. 10 
Engineer: James E. Brown, P.E. 
Pre Bid Date: 1:30 PM Thursday, May 22, 2008 
Bid Open Date: 1:00 PM Tuesday, June 3, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of the Proposed Sanitary Sewer Rehabilitation - Phase 1 to Serve Interstate Municipal Utility District 
Project Number: 1162-0520 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Interstate M.U.D. 
Engineer: Brian Ross, P.E. 
Pre Bid Date: 10:00 AM Thursday, May 29, 2008 
Bid Open Date: 10:00 AM Thursday, June 5, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 

Project: Construction of the Drainage Facilities & Paving and Appurtenances and Traffic Signals to Serve Broadway Improvements from Kingsley Drive to Kirby Drive 
Project Number: 1546-5180 
Final Bid
Tabulation


Apparent Bid
Result

Owner: Shadow Creek Ranch Development Company 
Engineer: James Ross, P.E. 
Pre Bid Date: 10:30 AM Thursday, May 29, 2008 
Bid Open Date: 10:30 AM Thursday, June 5, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $150.00 
Addendums:   1        2      

Project: Construction of the Water Supply Plant No. 1 Phase VIII (Installation of 2 Hydropneumatic Tanks) to Serve Sienna Plantation M.U.D. No. 1 
Project Number: 1411-0709 
Apparent Bid
Result

Owner: Sienna Plantation M.U.D. No. 1 
Engineer: Stephen Jones, P.E. 
Pre Bid Date: 10:30 AM Wednesday, June 4, 2008 
Bid Open Date: 10:30 AM Wednesday, June 11, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1      

Project: Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 89 THIS PROJECT HAS BEEN POSTPONED UNTIL FURTHER NOTICE 
Project Number: 0472-2689A 
Owner: Harris-Montgomery Counties M.U.D. No. 386 
Engineer: Randy Bowles, P.E. 
Pre Bid Date: 10:00 AM Thursday, June 5, 2008 
Bid Open Date: 2:00 PM Thursday, June 12, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1      

Project: Construction of the Sienna Lift Station No. 22 to Serve Sienna Plantation Municipal Utility District No. 10 
Project Number: 1470-1115B 
Apparent Bid
Result

Owner: Sienna Plantation M.U.D. No. 10 
Engineer: James E. Brown, P.E.  
Pre Bid Date: 11:30 AM Tuesday, June 17, 2008 
Bid Open Date: 11:30 AM Tuesday, June 24, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 

Project: Construction of the Proposed Waterline Interconnect to Freshwater Supply District No. 61 to Serve Harris County M.U.D. No. 248 
Project Number: 0460-4821 
Apparent Bid
Result

Owner: Harris County M.U.D. No. 248 
Engineer: Jeffrey DeLeon, P.E. 
Pre Bid Date: 2:00 PM Tuesday, June 10, 2008 
Bid Open Date: 2:00 PM Tuesday, June 24, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1        2        3      

Project: Construction of the Proposed Signalization at Sienna Christus Drive @ Sienna Parkway 
Project Number: 1475-0701-0801A 
Apparent Bid
Result

Owner: Sienna Plantation Management District 
Engineer: Matthew Johnson, P.E. 
Pre Bid Date: 1:00 PM Thursday, June 5, 2008 
Bid Open Date: 1:00 PM Thursday, June 26, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 
Addendums:   1        2      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Shadow Creek Ranch Broadway Extension Phase One 
Project Number: 1546-5181 
Apparent Bid
Result

Owner: Brazoria-Fort Bend County M.U.D. No. 1 
Engineer: James Ross, P.E. 
Pre Bid Date: 10:00 AM Friday, June 20, 2008 
Bid Open Date: 10:00 AM Friday, June 27, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $80.00 
Addendums:   1        2      

Project: Construction of the Water, Sanitary Sewer and Drainage Facilties and Paving and Appurtenances to Serve Water Street Phase Three 
Project Number: 1118-0621A 
Apparent Bid
Result

Owner: Harris County M.U.D. No. 481 
Engineer: Eddie Rucker, P.E. 
Pre Bid Date: 3:00 PM Thursday, June 19, 2008 
Bid Open Date: 3:00 PM Tuesday, July 1, 2008 
Mandatory: No
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $85.00 
Addendums:   1        2        3      

Project: Construction of the Lakemont Water Plant Expansion Phase 3 to Serve Fort Bend County M.U.D. No. 122 
Project Number: 0385-0503 
Owner: Fort Bend County M.U.D. No. 122 
Engineer: Gregg Haan, P.E. 
Pre Bid Date: 10:00 AM Wednesday, June 25, 2008 
Bid Open Date: 10:00 AM Tuesday, July 8, 2008 
Mandatory: Yes
Plans avail. for Review:: Yes
Plans avail. for Purchase: Yes
Plan Cost:: $75.00 

Project: Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Telfair Central Access Road