| Project: |
Construction of the Detention Basin "D" Phase 1 to Serve Galveston County Municipal Utility District No. 46 |
| Project Number: |
0074-0527D |
|
| Owner: |
Galveston County M.U.D. No. 46 |
| Engineer: |
Ben Lun, P.E. |
| Pre Bid Date: |
10:30 AM Tuesday, March 25, 2008 |
| Bid Open Date: |
10:30 AM Tuesday, April 1, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1 2
|
| Project: |
Construction of Water Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge 95 |
| Project Number: |
0472-2695 |
|
| Owner: |
Montgomery County M.U.D. No. 386 |
| Engineer: |
Donnie Reed, P.E. |
| Pre Bid Date: |
10:00 AM Thursday, March 27, 2008 |
| Bid Open Date: |
2:00 PM Thursday, April 3, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Windsor Creek at the Village of Creekside Park S. Greenprint Circle Extension |
| Project Number: |
0472-8106 |
|
| Owner: |
Harris-Montgomery County M.U.D. No. 386 |
| Engineer: |
Donnie Reed, P.E. |
| Pre Bid Date: |
10:30 AM Thursday, March 27, 2008 |
| Bid Open Date: |
2:30 PM Thursday, April 3, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of Sanitary Force Main to Serve The Woodlands 400 Acre Tract |
| Project Number: |
0472-7003A |
|
| Owner: |
Harris-Montgomery County M.U.D. No. 386 |
| Engineer: |
Donnie Reed, P.E. |
| Pre Bid Date: |
11:00 AM Thursday, March 27, 2008 |
| Bid Open Date: |
3:00 PM Thursday, April 3, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1 2 3
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Edgewater Section Three |
| Project Number: |
1118-0660A |
|
| Owner: |
Harris County M.U.D. No. 481 |
| Engineer: |
Edmund D. Rucker, P.E. |
| Pre Bid Date: |
3:00 PM Tuesday, March 25, 2008 |
| Bid Open Date: |
3:00 PM Tuesday, April 8, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1 2 3
|
| Project: |
Construction of the Storm Water Pump Station No. 2 Pumps, Controls and Electrical Modifications to Serve Fort Bend County Levee Improvement District No. 17 |
| Project Number: |
1800-0313B-012 |
|
| Owner: |
Fort Bend County Levee Improvement District No. 17 |
| Engineer: |
Jason M. Kelly, P.E. |
| Pre Bid Date: |
11:00 AM Wednesday, April 2, 2008 |
| Bid Open Date: |
11:00 AM Wednesday, April 9, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of the Paving and Appurtenances to Serve Meadowcroft Boulevard and Wescott Avenue Phase III |
| Project Number: |
1800-1009A |
|
| Owner: |
Fort Bend County M.U.D. No. 138 |
| Engineer: |
Jason M. Kelly, P.E. |
| Pre Bid Date: |
2:00 PM Thursday, April 3, 2008 |
| Bid Open Date: |
2:00 PM Thursday, April 10, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Broadway Improvements from Kingsley Drive to Kirby Drive |
| Project Number: |
1546-5180 |
|
| Owner: |
Reinvestment Zone No. 2, City of Pearland, Texas |
| Engineer: |
James D. Ross, P.E. |
| Pre Bid Date: |
2:00 PM Tuesday, April 8, 2008 |
| Bid Open Date: |
2:00 PM Tuesday, April 15, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$100.00 |
| Addendums: |
1
|
| Project: |
Construction of the Force Main and Access Road to Serve Woodforest Phase 1 |
| Project Number: |
1173-0801 |
|
| Owner: |
Montgomery County M.U.D. No. 113 |
| Engineer: |
Donnie Reed, P.E. |
| Pre Bid Date: |
1:30 PM Wednesday, April 2, 2008 |
| Bid Open Date: |
1:30 PM Thursday, April 17, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$80.00 |
| Addendums: |
1 2
|
| Project: |
Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 97 |
| Project Number: |
0472-2697 |
|
| Owner: |
Harris-Montgomery County M.U.D. No. 386 |
| Engineer: |
Randy Bowles, P.E. |
| Pre Bid Date: |
10:00 AM Thursday, April 10, 2008 |
| Bid Open Date: |
2:00 PM Thursday, April 17, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1 2
|
| Project: |
Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 96 |
| Project Number: |
0472-2696 |
|
| Owner: |
Harris-Montgomery County M.U.D. No. 386 |
| Engineer: |
Randy Bowles, P.E. |
| Pre Bid Date: |
10:30 AM Thursday, April 10, 2008 |
| Bid Open Date: |
2:30 PM Thursday, April 17, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 21 |
| Project Number: |
1470-1121 |
|
| Owner: |
Sienna Plantation M.U.D. No. 10 |
| Engineer: |
James E. Brown, P.E. |
| Pre Bid Date: |
1:00 PM Thursday, April 24, 2008 |
| Bid Open Date: |
1:00 PM Thursday, May 1, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Project: |
Construction of Water Distribution and Drainage Facilities to Serve The Woodlands Phase 3 Village of Grogan's Mill Lake Woodlands East Shore Mid Lake Reserve A |
| Project Number: |
0472-0840A |
|
| Owner: |
Montgomery County M.U.D. No.'s 6, 60 and 67 |
| Engineer: |
Donnie Reed, P.E. |
| Pre Bid Date: |
10:00 AM Thursday, April 24, 2008 |
| Bid Open Date: |
2:00 PM Thursday, May 1, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of Pavement and Drainage Facilities to Serve The Woodlands Gosling Road and Flintridge Road Dualization |
| Project Number: |
0472-0271 |
|
| Owner: |
The Woodlands Road Utility District No. 1 |
| Engineer: |
Donnie Reed, P.E. |
| Pre Bid Date: |
10:30 AM Thursday, April 24, 2008 |
| Bid Open Date: |
2:30 PM Thursday, May 1, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 94 |
| Project Number: |
0472-2694 |
|
| Owner: |
Montgomery County M.U.D. No. 386 |
| Engineer: |
Donnie Reed, P.E. |
| Pre Bid Date: |
11:00 AM Thursday, April 24, 2008 |
| Bid Open Date: |
3:00 PM Thursday, May 1, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of the Proposed Signalization at Oyster Creek Place Drive/Sienna Ranch Road at Hwy 6 |
| Project Number: |
1475-0703 |
|
| Owner: |
Sienna Plantation Management District |
| Engineer: |
Matthew Johnson, P.E. |
| Pre Bid Date: |
11:00 AM Thursday, May 8, 2008 |
| Bid Open Date: |
11:00 AM Thursday, May 15, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Ditches "6L" and "6M" |
| Project Number: |
0472-7010 |
|
| Owner: |
Harris-Montgomery Counties M.U.D. No. 386 |
| Engineer: |
Randy Bowles, P.E. |
| Pre Bid Date: |
10:00 AM Wednesday, May 7, 2008 |
| Bid Open Date: |
2:00 PM Thursday, May 15, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 22 |
| Project Number: |
1470-1122 |
|
| Owner: |
Sienna Plantation M.U.D. No. 10 |
| Engineer: |
James E. Brown, P.E. |
| Pre Bid Date: |
1:00 PM Tuesday, May 13, 2008 |
| Bid Open Date: |
1:00 PM Tuesday, May 20, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 98 |
| Project Number: |
0472-2698 |
|
| Owner: |
Harris-Montgomery Counties M.U.D. No. 386 |
| Engineer: |
Randy Bowles, P.E. |
| Pre Bid Date: |
10:00 AM Thursday, May 15, 2008 |
| Bid Open Date: |
2:00 PM Thursday, May 22, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 15 |
| Project Number: |
1470-1115 |
|
| Owner: |
Sienna Plantation M.U.D. No. 10 |
| Engineer: |
James E. Brown, P.E. |
| Pre Bid Date: |
10:00 AM Wednesday, May 21, 2008 |
| Bid Open Date: |
10:00 AM Wednesday, May 28, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of the Drainage Channel/Amenity Lakes (Regional Storage Phase 2) to Serve Sienna Village of Anderson Springs Section 15 |
| Project Number: |
1470-1115A |
|
| Owner: |
Sienna Plantation M.U.D. No. 10 |
| Engineer: |
James E. Brown, P.E. |
| Pre Bid Date: |
10:30 AM Wednesday, May 21, 2008 |
| Bid Open Date: |
10:30 AM Wednesday, May 28, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of the Woodridge Main Lift Station to Serve Woodridge M.U.D. |
| Project Number: |
1991-0002 |
|
| Owner: |
Woodridge M.U.D. |
| Engineer: |
Matthew Richter, P.E. |
| Pre Bid Date: |
2:00 PM Wednesday, May 21, 2008 |
| Bid Open Date: |
2:00 PM Wednesday, May 28, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Sienna Village of Anderson Springs Section 23 |
| Project Number: |
1470-1123 |
|
| Owner: |
Sienna Plantation M.U.D. No. 10 |
| Engineer: |
James E. Brown, P.E. |
| Pre Bid Date: |
1:30 PM Thursday, May 22, 2008 |
| Bid Open Date: |
1:00 PM Tuesday, June 3, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of the Proposed Sanitary Sewer Rehabilitation - Phase 1 to Serve Interstate Municipal Utility District |
| Project Number: |
1162-0520 |
|
| Owner: |
Interstate M.U.D. |
| Engineer: |
Brian Ross, P.E. |
| Pre Bid Date: |
10:00 AM Thursday, May 29, 2008 |
| Bid Open Date: |
10:00 AM Thursday, June 5, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Project: |
Construction of the Drainage Facilities & Paving and Appurtenances and Traffic Signals to Serve Broadway Improvements from Kingsley Drive to Kirby Drive |
| Project Number: |
1546-5180 |
|
| Owner: |
Shadow Creek Ranch Development Company |
| Engineer: |
James Ross, P.E. |
| Pre Bid Date: |
10:30 AM Thursday, May 29, 2008 |
| Bid Open Date: |
10:30 AM Thursday, June 5, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$150.00 |
| Addendums: |
1 2
|
| Project: |
Construction of the Water Supply Plant No. 1 Phase VIII (Installation of 2 Hydropneumatic Tanks) to Serve Sienna Plantation M.U.D. No. 1 |
| Project Number: |
1411-0709 |
|
| Owner: |
Sienna Plantation M.U.D. No. 1 |
| Engineer: |
Stephen Jones, P.E. |
| Pre Bid Date: |
10:30 AM Wednesday, June 4, 2008 |
| Bid Open Date: |
10:30 AM Wednesday, June 11, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1
|
| Project: |
Construction of Water, Sanitary Sewer and Drainage Facilities to Serve The Woodlands Village of Sterling Ridge Section 89 THIS PROJECT HAS BEEN POSTPONED UNTIL FURTHER NOTICE |
| Project Number: |
0472-2689A |
| Owner: |
Harris-Montgomery Counties M.U.D. No. 386 |
| Engineer: |
Randy Bowles, P.E. |
| Pre Bid Date: |
10:00 AM Thursday, June 5, 2008 |
| Bid Open Date: |
2:00 PM Thursday, June 12, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1
|
| Project: |
Construction of the Sienna Lift Station No. 22 to Serve Sienna Plantation Municipal Utility District No. 10 |
| Project Number: |
1470-1115B |
|
| Owner: |
Sienna Plantation M.U.D. No. 10 |
| Engineer: |
James E. Brown, P.E.
|
| Pre Bid Date: |
11:30 AM Tuesday, June 17, 2008 |
| Bid Open Date: |
11:30 AM Tuesday, June 24, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Project: |
Construction of the Proposed Waterline Interconnect to Freshwater Supply District No. 61 to Serve Harris County M.U.D. No. 248 |
| Project Number: |
0460-4821 |
|
| Owner: |
Harris County M.U.D. No. 248 |
| Engineer: |
Jeffrey DeLeon, P.E. |
| Pre Bid Date: |
2:00 PM Tuesday, June 10, 2008 |
| Bid Open Date: |
2:00 PM Tuesday, June 24, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1 2 3
|
| Project: |
Construction of the Proposed Signalization at Sienna Christus Drive @ Sienna Parkway |
| Project Number: |
1475-0701-0801A |
|
| Owner: |
Sienna Plantation Management District |
| Engineer: |
Matthew Johnson, P.E. |
| Pre Bid Date: |
1:00 PM Thursday, June 5, 2008 |
| Bid Open Date: |
1:00 PM Thursday, June 26, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Addendums: |
1 2
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Shadow Creek Ranch Broadway Extension Phase One |
| Project Number: |
1546-5181 |
|
| Owner: |
Brazoria-Fort Bend County M.U.D. No. 1 |
| Engineer: |
James Ross, P.E. |
| Pre Bid Date: |
10:00 AM Friday, June 20, 2008 |
| Bid Open Date: |
10:00 AM Friday, June 27, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$80.00 |
| Addendums: |
1 2
|
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilties and Paving and Appurtenances to Serve Water Street Phase Three |
| Project Number: |
1118-0621A |
|
| Owner: |
Harris County M.U.D. No. 481 |
| Engineer: |
Eddie Rucker, P.E. |
| Pre Bid Date: |
3:00 PM Thursday, June 19, 2008 |
| Bid Open Date: |
3:00 PM Tuesday, July 1, 2008 |
| Mandatory: |
No |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$85.00 |
| Addendums: |
1 2 3
|
| Project: |
Construction of the Lakemont Water Plant Expansion Phase 3 to Serve Fort Bend County M.U.D. No. 122 |
| Project Number: |
0385-0503 |
| Owner: |
Fort Bend County M.U.D. No. 122 |
| Engineer: |
Gregg Haan, P.E. |
| Pre Bid Date: |
10:00 AM Wednesday, June 25, 2008 |
| Bid Open Date: |
10:00 AM Tuesday, July 8, 2008 |
| Mandatory: |
Yes |
| Plans avail. for Review:: |
Yes |
| Plans avail. for Purchase: |
Yes |
| Plan Cost:: |
$75.00 |
| Project: |
Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Telfair Central Access Road |
| | |